PRIMEX • LOCAL PROTOTYPE • NOT AN INSTALLATION DESIGN

Plan your camp’s power requirements

Build a preliminary branch-box and cable enquiry list. This prototype supports a 208Y/120 V, three-phase source and selected MEPDIS-R equipment.

Design the camp visually

Place equipment on an aerial plan, draw cable routes and estimate distances.

Open the aerial layout designer to

1. Source and planning allowance

The allowance is your planning preference, not a code-required factor. Source kVA, phase balance and starting demand still require confirmation.

2. Loads and feeder routes

Use one row per group of identical loads. Enter operating kW per load and its known power factor. Route length is from the proposed upstream distribution point to this group. Each suggested box gets its own feeder; this version does not design cascaded boxes.

Group / areaLoad connectionQuantitykW eachPower factorRoute (m)